Furniture for hotels that need 200 chairs by Q3.

We have shipped to nineteen properties this year — from Bensley's mountain lodges to a 210-room Park Hyatt refresh. Full FF&E programs, phased delivery against your opening schedule, and one direct line to the floor.

19 hotels in 2024 · 4 hotel groups on repeat · Outdoor warranty: 5 yrs
The scale

What a typical year looks like.

Audited annually. Verifiable on request. The numbers procurement teams want before the first call.

01
19
Hotels delivered in 2024
Across 7 hotel groups
02
24,000
Pieces shipped to hospitality
Indoor + outdoor lines
03
94%
On-time delivery (last 24 mo.)
6% pushed by client, not by us
Recent properties

Where the line has been installed.

A sampling of the last twelve months. Reference visits arranged on request — we can usually put you in touch with the GM or FF&E lead.

Khánh Hòa, VN · 2024

Six Senses Ninh Vân Bay

SCOPE Villa suites + spa lounge
UNITS 720 pieces
Hồ Chí Minh · 2023

Park Hyatt Saigon — refresh

SCOPE 210 rooms · F&B
UNITS 1,280 pieces
Mustang, NP · 2024

Bensley · Shinta Mani Mustang

SCOPE Mountain lodge
UNITS 480 pieces
Hà Nội · 2023

Capella Hanoi · pool deck

SCOPE Outdoor program
UNITS 160 pieces
The room program

The math, before the meeting.

What a typical property orders, what the line speed is, and how long each kit takes from PO to crate.

KitContentsPer room / venueLead time
Bedroom kit1× armchair + 1× side table + 1× luggage bench3 pieces / room6 wks
Lobby seatingLounge program (2-, 3-seat & ottoman)8–24 pieces8 wks
F&B / restaurantDining chairs + barstool + banquette skeleton40–200 chairs8–10 wks
Pool / outdoorUV-stable synthetic rattan, marine-grade fastenings20–120 pieces10–12 wks
Spa / wellnessDaybeds + treatment chairs12–40 pieces8 wks
For a 200-room property, a typical bedroom kit total is 600 pieces, delivered in three phases over 14 weeks — the first phase a mockup room at week 6.
Materials & certification

What is in the chair.

The spec sheet most architects ask for after the first sample arrives.

Materials
Natural rattan (Phú Vinh) · synthetic Viro/Rehau for outdoor · FSC ash / oak frames
Finishes
Water-based lacquer · oil · UV-stable poly
Cushions
Sunbrella · Crypton · OEKO-TEX 100 fills
Frame warranty
10 yrs indoor · 5 yrs outdoor (UV)
Audits passed
BSCI · ISO 9001 · IWAY 6.0 · FSC chain of custody
Lab tests
BS 5852 part 0 & 1 (fire) · BIFMA X5.4 (lounge) on request
What we will & won't do

Plain language, because it saves us both time.

What we're good at
  • Full FF&E programs from a single weaver: bedroom kit, lobby, F&B, pool, spa — one PO, one factory.
  • Phased delivery against your opening schedule — mockup rooms by month 2, floor 1–4 by month 4.
  • UV-stable synthetic rattan that survives ten years of Phú Quốc salt air without changing colour.
  • Repeating SS / AW programs for hotel groups — same chair, every property, every year.
  • On-site QC visits welcomed — we have hosted procurement teams from Marriott, Hyatt and Bensley on the floor.
What we're not for
  • Single-room replacement orders under 20 pieces — sub-MOQ for our line speed.
  • Sub-30-day rush builds — we will not put the IKEA line on hold to ship 8 chairs by Friday.
  • Procurement teams that require pricing through a third-party bidding portal we cannot speak to humans on.
Nguyễn Thị Ngọc
Your sales lead

Nguyễn Thị Ngọc

HOSPITALITY ACCOUNT LEAD · 9 YRS AT THE FACTORY

I run the FF&E desk. I pick up calls between 8 and 18 Vietnam time. If you send a procurement deck, I'll come back with a phased delivery proposal and a line of bedroom-kit samples on the next DHL pouch.

Get in touch

Send us the FF&E spec. We'll come back inside 48 hours.

If we can't deliver on your timeline we'll say so on the first email — not the third revision.